Skip Navigation Linkspalmview

Palmview (State Primary School)

Project update for the new Palmview school.

  • A new state primary school in the growing area of Palmview will open for Prep to Year 6 students for 2021.
  • The school is located on Peter Crosby Way at Sippy Downs and is co-located with the new special school opening for 2021.
  • Mr Andrew Walker was appointed as the Foundation Principal of the new school in April 2020.
  • Visit the school Facebook page or website.
  • FK Gardner and Sons was appointed as the building contractor in early 2020 to construct the new school.
  • Construction of the school commenced in early 2020.

Project update

  • Site establishment, bulk earthworks, the implementation of erosion and sediment controls and building platforms are progressing well on site.
  • The installation of steel framing for the administration building and information services and staff building are continuing.
  • The ground floor concrete slabs for the learning centres have been poured.
  • The canteen stairwell is prepped for the concrete pour, as is the prep learning centre final pavements.

Local catchment area

Once finalised, the catchment maps will be available via EdMap.

To find out if your property is within the catchment, search the interactive map below.

Please type your address in the search box below. You can select a suggestion at any time by clicking on it.

Enrolment expression of interest

The Department of Education is seeking expressions of interest for students wishing to enrol at the new primary school for Palmview.

Registration does not guarantee your child a place but ensures you are part of the developing school community.

Register your interest to enrol a student.

Register for new school updates.

Download all project images (ZIP, 80.3MB)
Licence
Creative Commons Attribution 3.0 Australia (CC BY 3.0) (https://creativecommons.org/licenses/by/3.0/au/ )
Last updated
10 September 2020